PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed wall forms along 6 Line from L-G  (800x600).jpg Installing foundation wall rebar at Elev. 7-Stair -,4,5 Facing West (800x600).jpg Stripped Elev. -1,2,3 2nd Floor Facing South.jpg Foundation wall rebar at Elev. 7-Stair -4,5 Facing East (800x600).jpg Foundation wall rebar at Stair -4,5 Facing North-West (800x600).jpg Installing foundation wall rebar at Elev. 7 Facing North (800x600).jpg Stair -4,5- Elev. 7 Foundation wall rebar (800x600).jpg Stripped Elev. -1,2,3 2nd Floor Facing South-West (800x600).jpg Waterproofing along c.l 2.5 from G-K Facing West (800x600).jpg
Previous pageNext page Foundation wall rebar at Stair -4,5 Facing North-West (800x600)
Foundation wall rebar at Stair -4,5 Facing North-West (800x600)